The Roofers Group  •  Los Angeles, CA

A clear, itemized plan for your roof replacement — scope, materials, pricing, timeline, and warranty, with nothing left vague.

Prepared for: Homeowner
Valid: 30 days
License: CA Licensed & Insured
Scroll
Contractor
The Roofers Group
Phone
(310) 988-1811
Office
145 S Fairfax Ave #200, LA 90036
Proposal No.
TRG-2026-0148
01 / SCOPE OF WORK

Full Roof Replacement

A complete tear-off and re-roof of the existing structure. Here is exactly what is included, start to finish.

  • 01Tear-off & inspectionRemove all existing layers down to the deck and inspect the sheathing for damage or rot.
  • 02Deck repair & underlaymentReplace any damaged sheathing, then install synthetic underlayment and ice-and-water shield at vulnerable areas.
  • 03Flashing & ventilationNew flashing at all penetrations and ridge-vent ventilation for proper attic airflow.
  • 04Shingle installationInstall new architectural asphalt shingles with manufacturer-spec nailing and ridge caps.
  • 05Cleanup & haul-awayFull debris removal, magnetic nail sweep of the property, and disposal included.
Roof installation
02 / MATERIALS

What Goes On Your Roof

Brand, type, and color for every major component. Final color confirmed with you before order.

ComponentBrand / TypeDetail
ShinglesArchitectural asphalt (30-yr)Color: Weathered Wood (confirm before order)
UnderlaymentSynthetic moisture barrierFull coverage over deck
Ice & water shieldSelf-adhering membraneEaves, valleys, penetrations
FlashingGalvanized / aluminumAll walls, chimney, vents
VentilationContinuous ridge ventBalanced intake / exhaust
03 / PRICING

Itemized Breakdown

An honest line-item estimate. No hidden fees — disposal and cleanup are already in here.

Labor — tear-off & installation$9,800
Materials — shingles & components$7,400
Deck repair allowance$1,200
Disposal & debris haul-away$900
Permits & inspection$700
Total estimate$20,000

What's included

  • All labor, materials, and subcontractor costs
  • Full cleanup and magnetic nail sweep
  • Permit filing and final inspection
  • Change orders quoted in writing before any extra work
04 / TIMELINE

Start To Finish

A typical single-family replacement. Weather delays add days as needed, and we keep you posted.

Day 0

Sign & Schedule

Deposit received, materials ordered, start date locked in.

Day 1

Tear-Off

Remove old roof, inspect and repair the deck.

Day 2

Install

Underlayment, flashing, shingles, and ventilation.

Day 3

Cleanup & Final

Debris haul-away, nail sweep, and final walkthrough.

05 / Payment Terms

Simple & Staged

  • Deposit: 25% to schedule and order materials
  • Progress: 50% at start of installation
  • Final: 25% on completion and your sign-off
  • Accepted: Check, card, and bank transfer
06 / Warranty

Backed In Writing

  • Workmanship: 10-year labor warranty
  • Materials: Up to 30-year manufacturer coverage
  • Transferable: Workmanship warranty transfers to a new owner
  • Support: Call us first — we handle any issue directly
07 / LEGAL & TERMS

No Surprises

The fine print, in plain English, so you can compare us side by side with anyone else.

Ready To Move Forward?

Approve this proposal and we'll lock in your start date. Questions on any line item? Just call — we'll walk you through it.

Call (310) 988-1811
Phone(310) 988-1811
Address145 S Fairfax Ave #200, Los Angeles, CA 90036
Webtheroofersgroup.com